Lorclon Ltd » Groundworks / Civil Engineering
Whilst Lorclon offers a wide range of services to the building industry it is in the area groundworks that we specialise . We are beginning to get a lot of repeat work in earthworks, drainage, ducting, reinforced concrete, underpinning and all aspects of external works as a result of a hands on approach that is second to none.

We recognise that working in harmony with the client on all aspects at all stages of the project can lead to all round satisfaction and long term relationships.

Lorclon has done much work in the last year for petrochemical industry where we re-develop and develop petrol forecourts with all the associated groundworks.


Olympic Park, Stratford

Main Contractor: VolkerFitzpatrick

The scope of work included :

Temporary works – roads. With the access routes within the site continuously changing as work progresses we have been involved with the construction of the temporary roads throughout the site.
 
  • Temporary works – roads. With the access routes within the site continuously changing as work progresses we have been involved with the construction of the temporary roads throughout the site.
  • Permanent works - Lifeline Road Lea Interchange. The project also includes the reconstruction of the north plaza entrance to the park for the games phase of 2012, the construction of retaining walls with gabion basket fronts between the north of the park and the A12 and the redevelopment of the A12 Leytonstone slip road, including the rerouting of services.
  • Waterworks Wharf - RC Slabs and groundworks including road construction, drainage and the installation of an interceptor .
  • The North and South Plaza, SOC and OPEPO centres. The North and South plaza‟ for the Olympic park are the only vehicle access and included groundworks and reinforced concrete works including drainage. Similar contracts were carried out within the SOC and OPEPO centre on the perimeter of the park. .
Apprentices Centre

During the project we were asked if we could assist the ODA in providing, at short notice, a building to induct and train apprentices. We recognised that this would need an innovative solution to meet the tight time and budget restraints. The apprentices centre was constructed in the centre of the park over a 2 week period. The structure was formed with modular units covered with a timber framed roof with traditional slate tiles. The inside was plastered and carpeted while the outside was rendered. The ODA were delighted with the quality of the end-product.
 
All milestones to date completed on time and to budget.