Lorclon Ltd » Groundworks / Civil Engineering
Whilst Lorclon offers a wide range of services to the building industry it is in the area groundworks that we specialise . We are beginning to get a lot of repeat work in earthworks, drainage, ducting, reinforced concrete, underpinning and all aspects of external works as a result of a hands on approach that is second to none.

We recognise that working in harmony with the client on all aspects at all stages of the project can lead to all round satisfaction and long term relationships.

Lorclon has done much work in the last year for petrochemical industry where we re-develop and develop petrol forecourts with all the associated groundworks.


Main Contractor: VolkerFitzpatrick
The scope of work included :
Temporary works – roads. With the access routes within the site continuously changing as work progresses we have been involved with the construction of the temporary roads throughout the site.
 
 
 
Main Contractor: McGee Construction
Description
Lorclon completed an underpinning project on this landmark site opposite the Dorchester Hotel which, when finished, will be the most expensive commercial property per square foot in Europe.
 
 
 
Main Contractor: Cleshar Contract Services
Description :
These works incorporated the installation of underground drainage works, construction of train wash and interceptor pit. Construction of foundation bases for various columns and staircases and buildings of the Block work Piers for Pre-cast platform Planks.
 
 
 
Main Contractor: - DBC Contact:
Description :
This project consists of the development of site on Bridgewater Road, Alperton. The development consists of a new RC Basement Car Park, Troughed Suspended Ground Floor and 4 Storey Steel Frame.
 
 
 
Lorclon carried out all the Groundwork and Gabion works involved in this package which were constructed on the Chiltern line near Breakspeare Station.
 
 
 
Lorclon installed a manage on the private property of one of England's leading property speculators and racehorse owners in this quiet Buckinghamshire village. Our work involved installing a drainage system and the initial base topped off with silica (equestrian) sand and a rubber topper. We also carried extensive refurbishment works on the stables.
 
 
 
These works incorporated the installation of underground drainage works construction of train wash and interceptor pit, construction of foundations bases for various columns and staircases and building of the Block work piers for pre-cast platform planks.
 
 
 
Lorclon carried out the car park works which included drainage works, surfacing work as well as the foundation work hardstandings and lorry parking bays.
 
 
 
Lorclon's package included all the external drainage and service installation along with the external pavement and hardstanding finishes.
 
 
 
Lorclon ltd construct phase one of numerous phases of bases for Skanka on Colt Telecommunications site in Welwyn Garden City. The site will be used as a back-up for data systems around the London area in the case of an energy shortage (power black out) each phase of bases comprise of approximately 900m of ducting, 180m³ of concrete all finished to a very high standard within a very secure facility.
 
 
 
Wembley Park Station went through a major capacity enhancement works to cope with crowds attending the new stadium. Lorclon was a keen member of the core team that carried out these works specialising in platform demolition and reforming along with the protective hoarding systems.
 
  Copyright © 2010 Lorclon Ltd All Rights Reserved. Design & Developed by: ls-itsolutions.com