Lorclon worked on behalf of VolkerStevin on Thames Tideways-King Edwards Memorial Park Foreshore (KEMPF) site. Lorclon’s works included excavation, Pile Cropping and construction of Reinforced Concrete Slab and Beams within the cofferdam.
Due to the Cofferdam been affected by Tidal conditions, to reduce delays all Reinforcement cages for the Beams were constructed Land side and lifted using a 130t crawler crane into position within the cofferdam.